An entrepreneur, intending to setup a factory involving a Hazardous process as defined under section 2 (cb) and specified in the First Schedule of the Factories Act,1948 is required to obtain previous permission of the State Government for its initial location or expansion of such factory by submitting application for appraisal of the site to the Chairman of the Site Appraisal Committee who is the Chief Inspector of the state in prescribed form along with 15 copies thereof. The Site Appraisal Committee shall examine the application and make its recommendation to the State Government. On getting approval from the State Government for the establishment or expansion of a factory involving hazardous process the entrepreneur shall follow the procedure for approval of Plans for construction or extension of factory building, installation of machinery, prime movers and/ or connection of electrical power and also for registration and licensing of the factory from the Chief Inspector of Factories, for the purpose of the said Act.
(a)Diagrammatic Form:
(b)Description of the sequence of steps depicted in the above diagram
The process flow consist of three stages, viz,
(1) Site Appraisal, (2) Approval of plans and (3) Registration and Licensing
Stage: 1
Stage: 2
Stage: 3
Prescribed form No. 1 and Form No.2 each in triplicate and Application for Site Appraisal in 15 copies all signed by the applicant.
An occupier / Licensee should have the following eligibility
Every application shall be accompanied by a treasury receipt in original, showing that the appropriate amount of fee has been paid into the local treasury under the head of Account “0230, Labour and Employment, 104 – Fees realised under the Factories Act,
1) Stage – 1: Site Appraisal
(a) Application to the Site Appraisal Committee prescribed under Rule 61G(3)(b) (15 copies along with following documents)
(b) Land Documents (deed of ownership/ lease, indicating Dag No. & Patta No., Total Area, etc.)
(c) Clearance certificate from State/ Central Govt. under I.F.Act,1927 and E.P.Act,1986.
(d) N.O.C. from Local authority in respect of location of such factory
(e) Site Plan showing details as indicated in item 3.1(a)-(e) & 3.4 of the application format
(f) Block diagram of the buildings and installations, in the proposed site
(g) Soil test report
(h) Contour Map of the area
(i) Project Report in detail
(j) Proposed Health and Safety Policy
(k) Meteorological data relating to the site (ref: Item No. 6.1 to 6.4 of the application format.)
(l) Process flow diagram with brief description of manufacturing process and technology
(m) Material Safety Data Sheet in respect of each hazardous substance
(n) Process Hazards Information (ref: Item No. 11.1 to 11.3 of the application format.)
(o) On-Site Emergency/ Disaster preparedness Plan and Off-Site Emergency Plan/ Mutual Aid Scheme
(p) Partnership deed in case of a firm or other association of individuals
(q) Articles of Association in case of a company along with list of directors/ shareholders
2) Stage – 2: Approval of Plans
(a) Form No. 1 Prescribed under Rule – 3 (in triplicate)
(b) Process Flow Diagram
(c) Brief write up on process and technology
(d) Plans in duplicate ( Blue Printed)
(i) drawn to scale showing the site of the factory and immediate surroundings including adjacent buildings and other structures, roads drains etc.
(ii) drawn to scale showing the plan, elevation and necessary cross- section of the various buildings, including all relevant details relating to natural lighting, ventilation and means of escape in case of fire. The plan shall also clearly indicate the position of the plant and machinery, aisles, electrical panels, switches, motors with rated H.P. etc and passage ways.
(e) NOC from local authorities in respect of non- agricultural land, forest, wet land, hills, sanctuaries etc (SDG – 15, Assam vision 2030)
(f) Clearance certificate from the controller of explosives wherever applicable
(g) Certified true copy of executed deed of ownership/ lease/ allotment of land/ building/ flat etc.
3) Stage – 3: Registration and licencing
(a) Form No. 2 prescribed under Rule – 4 and Rule – 7 in triplicate
(b) Treasury Receipt in original, showing deposit of appropriate fees as per schedule A,B or C [Rule 5 – (1)]
(c) Executed Deed of Partnership in case of a firm or other association of individual and nomination of occupier/ licensee for the purpose of the Act.
(d) Articles of Association and Memorandum of Incorporation in case of a company under the Indian Companies Act 1956, and list of Directors/ Shareholders and resolution of B.O.D.’s for nomination of occupiers for the purpose of the Act.
(e) Appointment letter in respect of Chief Administrative head of the unit from the concerned Ministry/ Board in case of Govt. / Local Fund as occupier for the purpose of the Act.
(A) For Permission of Site Appraisal
(a)Due date for submission: Any day during the year for which licence is applied for.
(b)Time for processing: 90 Days ( maximum)
(B) For Approval of Plan
(a) Due date for submission: Immediately after obtaining grant of permission for the Site from the Govt..
(b) Time for processing:- 45 Days (maximum).
(C) For Registration and licensing
(a) Due Date for submission: At least 15 (fifteen) days before the occupation or use any premises as a factory.
(b) Time for processing:- 45 Days (maximum).
(A) For Permission of Site Appraisal
Secretary,
Site Appraisal Committee. ,
O/o Chief Inspector of Factories, Assam,,
N.P.S. School Lane, Betkuchi, Lokhra,
Guwahati – 781040, Assam
(B) For Approval of Plans and Registration & Licensing :-
(i) For Zone – I (Jurisdiction of Senior Inspector of Factories, Zonal Factory Office, Guwahati.)
Name: - Addl. Chief Inspector of Factories, Assam, Betkuchi,Lokhra, Guwahati – 781040, Assam
Phone No.:
Email id: cif_assam@yahoo.co.in, cif.labour.assam@gov.in
(ii) For Zone – II (Jurisdiction of Senior Inspector of Factories, Zonal Factory Office, Dibrugarh and Zonal Factory Office, Jorhat. )
Name: Addl. Chief Inspector of Factories, Assam, Betkuchi,Lokhra, Guwahati – 781040, Assam
Phone:
Email id: cif_assam@yahoo.co.in, cif.labour.assam@gov.in
(iii)For Zone – III ( Jurisdiction of Senior Inspector of Factories, Zonal Factory Office, Bongaigaon )
Name: Addl. Chief Inspector of Factories,Assam, Betkuchi,Lokhra, Guwahati – 781040, Assam
Phone:
Email id: cif_assam@yahoo.co.in, cif.labour.assam@gov.in
As of now, the service is online in the Office of the Chief Inspector of Factories, Assam, NPS International School Lane, Betkuchi, Lokhra, Guwahati-40, Assam.